<th id="s8dto"><track id="s8dto"></track></th>

  • <button id="s8dto"><acronym id="s8dto"><u id="s8dto"></u></acronym></button>
        1. <dd id="s8dto"><noscript id="s8dto"></noscript></dd>
            <li id="s8dto"></li>

              <th id="s8dto"><pre id="s8dto"></pre></th>

              <li id="s8dto"></li>
              技术交流 -- 公司总部-- Jiangsu zhongwei heavy industry machinery co., LTD.

              Ordering hotline:

              15206276688
              Focus on the customer
              Hydraulic press (hydraul…
              Leveling machine part of…
              Brake type shearing mac…
              Machine part of the user
              Shearing machine part of…
              Bending machine part of…
              Multiple water machine…
              contact
              Address : 31 Coastal Road,Haian County
              TEL: 0513-88216522
              Fax: 0513-80260027
              Website: www.savjeti-hr.com
              Email: jszwjx@jszwjx.com
              Technical communication

              Hydraulic bending machine maintenance

              In front of the machine maintenance or brush machine, upper die should be aimed at lower die down after shutdown, until after work, if you need to boot, or other operations, should will choose in manual mode, and ensure safety. The maintenance content is as follows:

              1, the hydraulic circuit

              A. weekly check the tank oil level, such as hydraulic system also should check after repair, oil level is lower than the oil window should include hydraulic oil;

              B. the hydraulic oil used for ISO HM46 or MOBIL DTE25;

              C. new work 2000 hours after the oil should be replaced, since every work of 4000 ~ 6000 hours after the oil should be replaced, the oil change every time, should be cleaning tank;

              D. system oil temperature should be between 35 ℃ ~ 60 ℃, shall not exceed 70 ℃, such as too high will lead to damage of metamorphic oil and accessories.

              2, filters,

              A. every time an oil change, filter should be replaced or cleaned thoroughly;

              B. machine tool has the relevant alarm or clean oil filter and other abnormal, should be replaced;

              C. on air filter, tank cleaning every three months to check, best 1 year replacement.

              3, hydraulic components

              A. monthly clean hydraulic components (base board, valve, motor, pump, tubing, etc.), prevent dirt from entering the system, cannot use cleaner;

              B. xinji used after a month, check whether there is any deformation on the oil pipe bend, if there is any exception should be replaced, use two months later, should tighten the joint of all parts, for the work should be shut down, when the system pressure.

              About us News center Product display Technical communication Visitors leave a message Privacy agreement Contact us
              Contact address: 31 Coastal Road,Haian County
              Email:jszwjx@jszwjx.com Site management
              All rights reserved in the jiangsu heavy industry machinery co., LTD.
              specializing in the production Hydraulic press Lapping machine Hydraulic press Shearing machine



              oo

              亚洲av无码一区东京热_久天啪天天久久99久孕妇_gg裸体艺术大胆裸体艺术_性欧美bbw性a片片高清视频